1. Home
  2. Electrical Renovations

Electrical renovations in Vaughan

Kitchen wiring, basement finishing and open-ceiling renovations: what the rough-in consists of, what the code asks for, and how inspection fits around your contractor's schedule.

Gutted room with exposed wood studs and two windows, yellow and blue cables run to blue device boxes at receptacle height and recessed light housings between the ceiling joists
Rough-in in a gutted room: device boxes set at receptacle height, cables run down the studs, recessed light housings between the joists. Shown in progress, before inspection and drywall.

Kitchen wiring

A kitchen has more dedicated circuits than any other room, and the code is specific about them. Counter receptacles go on their own 20 A circuits, or on split 15 A circuits, spaced so that no point along the counter is far from one. Any receptacle within 1.5 m of the sink is GFCI protected. The fridge, dishwasher, microwave and range hood each get their own circuit; the range gets a 240 V circuit sized to the model; an island or peninsula gets its own receptacle.

Lighting is planned at the same time: a grid of pot lights for the room, pendants over the island on a separate switch, under-cabinet lighting on its own, and a dimmer only where the fixtures can take one.

What affects scope: whether the ceiling and walls are open, how far the kitchen is from the panel, whether the panel has room for the new circuits, and whether an induction range or a built-in appliance adds a large load.

Modern kitchen with two white pendant lights over a white island, recessed pot lights in the ceiling, dark wood cabinets and stainless appliances
Finished kitchen: pot lights in a grid across the ceiling and two pendants over the island, each on its own switch.

Basements and new rooms

Finishing a basement means new circuits for every room, receptacles spaced along the walls as the code requires, arc-fault protection on most of them, and lighting on switches at each entrance. It is also the point at which smoke alarms get brought up to current requirements: one on every storey, interconnected so they all sound together, with carbon monoxide alarms where a furnace, water heater or attached garage calls for them.

A basement with a kitchen, a laundry or a bathroom adds dedicated circuits for each. A basement apartment adds a separate set of questions about the panel, which we will raise early rather than at inspection.

Open ceilings and lighting layouts

When a ceiling comes down, everything above it is reachable: old cable runs can be replaced, new circuits added, and pot lights laid out from a plan rather than from wherever the joists allow. Housings in insulated ceilings are rated for contact with insulation. In a coffered or beamed ceiling the positions are marked and checked with temporary lamps before anything is cut, because a pot light in the wrong panel is hard to undo.

Hallway with the ceiling drywall removed exposing joists, cables and plumbing, a staircase on the right and the front door at the end
In progressA hallway ceiling opened during a renovation: joists, existing cables and plumbing exposed so new circuits can be run before it is closed. Shown in progress.

How a renovation job runs

The order is set by inspection, not by us. Nothing is covered until it has been seen.

Plan and rough-in

We walk the plan with you and your contractor: where every receptacle, switch, fixture and appliance goes and which circuit feeds it. Boxes are set at the right heights, cable is run and stapled, housings are placed, home runs are labelled at the panel. The Electrical Safety Authority inspects the rough-in before insulation and drywall go on.

Finish and final

After drywall and paint, devices, fixtures, alarms and cover plates go in. Each circuit is tested, the directory is written, and ESA makes the final inspection. If the renovation needs a building permit from the City of Vaughan, the electrical notification is filed alongside it, and we coordinate the dates with your contractor so nobody waits on an inspector.

Working with your contractor

Most renovations in Vaughan have a general contractor who sets the schedule. We fit into it: rough-in in the window between framing and insulation, finish after paint. What makes that go smoothly is a plan agreed before framing is done, because moving a box after drywall costs far more than moving it on paper.

If you are managing the work yourself, we will tell you which inspections apply and when, and what the drywaller needs to leave accessible.

Receptacle mounted on the back wall of a sink cabinet with a cord plugged in, beside a water treatment unit, white tubing and a black drain trap
A receptacle added inside a sink cabinet so a water treatment unit has its own outlet instead of an extension cord. Shown in use.
Contact usA drawing or a few photos of the space is enough to start.
Contact us